SCADA (Supervision, Control and Data Acquisition) is a control system architecture that uses computers, networked data communications, and graphical user interfaces for high-level management of process monitoring, but also uses other peripheral devices (programmable logic controllers and discrete PID controllers) such as process plant interfaces and machinery. SACI was responsible for the supply of the measurement converters connected to the RTUs of the different substations.
The project consisted of Rehabilitation of the current Regional Control System of Upper Egypt and SCADA System and Construction of the new Regional Control of The Middle Egypt.